As I've said before, this trailer has been a very agile project. There have been more than a few compromises, changes, and adjustments on the fly, and hey - in my defense, I've never done this before, and some of the 'rules of thumb' are an opportunity to insert your thumb between the board and the hammer!
In this case, I'd designed the trailer frame with a standard hitch receiver mounted on the tongue. If I'd thought about this just a little more carefully, I _might_ have calculated the weight of the rack, and the bikes and factored that extra 125lb into the calculation for axle placement - and moved the darn thing a few inches forward. As it was, my tongue weight was closer to 230lb with the trailer loaded, so 300 would be very much too much.
But that's all water under the bridge. Fast forward 10 months to now, and I realized that in order to bring bikes they'd either have to go on the roof of the car, or on the back of the trailer. I opted for the latter. Having acquired fairly decent CAD skills, I sat down and whipped out a very elegant folded piece of 1/4" steel, and sent that off to Send-Cut-Send. Nope, the drawing was not something they could work with, and from the sketch, the price would easily buy enough steel to rebuild the whole darn frame...So back to the drawing board. I started looking at hitch bits on the internet, and realized that all I really needed was a simple plate that could be replicated 3 times, and a steel tube for the receiver. Twenty five minutes later, I sent the new drawing off to Send-Cut-Send and received a quote that was *much* more reasonable (and in line with my target.