Milestone today. I get to check off the floor construction step. Now to get it home, drilled for the hold downs, and then some undercoat on the bottom and finish varnish on the top. Here's the last 4 inches of the bottom. Flipped it over and did the top as well.
The next week will be cleanups, finish cabling, finish work on the bottom of the floor, and a lot of refinement on the wall panel drawings. If everything goes well, I'll CNC panels in about 10 days.
No comments:
Post a Comment